Engineer installed another SMETS 1 meter at mine last week and said the same thing. He didn't have any second generation meters... useful!My smart meter has gone dumb since a switch to eon. Eon say there will be an over the air update by the end of the year so it works ? Finding this hard to believe unless someone here knows better ?
I would complain to offgem about that smets1 is not allowed to be used at all.Engineer installed another SMETS 1 meter at mine last week and said the same thing. He didn't have any second generation meters... useful!
My smart meter has gone dumb since a switch to eon. Eon say there will be an over the air update by the end of the year so it works ? Finding this hard to believe unless someone here knows better ?
A further update on my smart meter issue if anyone is interested. I did a lot of forum searching when I was trying to figure this out so just in case anyone else is having the same issue. I eventually raised an official complaint. Surprisingly enough, it then started working. The IHD still wasn't showing anything but they did some more messing around at their end and that sorted it out. Hopefully it all keeps working as it should. Of course if these things worked out of the box then it would save everyone a lot of time and hassle!
Had mine installed last Thursday and it's only displaying the gas symbol, pressing the button does nothing. EDF say they haven't had the details from the installer yet.
It takes two weeks to fully activate on the system, that's just the DCC sending the info back to EDF that's normal. One week for the setup data to go from our toughpads to EDF and another weeks for the data to be linked to the DCC account that was created when the installer activated the Comms on the Meter.Had mine installed last Thursday and it's only displaying the gas symbol, pressing the button does nothing. EDF say they haven't had the details from the installer yet.
It's nothing to do with the suppliers, it's all about the DCC and the communication from them to the suppliers.2 weeks, I wish. Bulb installed ours at the beginning of April and they still dont work properly. After numerous complaints and months of estimated billing its Ombudsman time
The whole industry should be utterly ashamed of the shambolic deployment of smets2, they learned nothing from the smets1 rollout debacle
It takes two weeks to fully activate on the system, that's just the DCC sending the info back to EDF that's normal. One week for the setup data to go from our toughpads to EDF and another weeks for the data to be linked to the DCC account that was created when the installer activated the Comms on the Meter.
I’ve the exact problem with my EDF display. I phoned up edf 3 or 4 days after the installation of smart meters to tell them it’s only showing gas consumption but they fobbed me off saying that will send an update to show me both. That was nearly two months ago. The display has now been off for the past month and I’ve got no plans to turn it back on
That's poor considering the amount of pressure to have the thing installed.
That pressure is down to the government threatening the profit margins of the power companies. They just have to get them in, there's nothing about doing a good job or making the meters work properly.
That pressure is down to the government threatening the profit margins of the power companies. They just have to get them in, there's nothing about doing a good job or making the meters work properly.
I helped design the approach, commercial model for the DCC, then the procurement for the company that runs it.It's nothing to do with the suppliers, it's all about the DCC and the communication from them to the suppliers.
I helped design the approach, commercial model for the DCC, then the procurement for the company that runs it.
These issues are not exactly what we had in mind at the time (2011). It's a bit frustrating to read this thread...
erh .. but the reporting of the readings is working to the supplier nonetheless ? which is its principal raison d'etreIts the communication I find poor. There was no mention of a long delay by EDF or the installer for the display to become functional and further contact with the supplier has proved pretty useless.