Soldato
- Joined
- 27 Mar 2013
- Posts
- 9,141
I'm in the process of going through planning for a mancave/study (and a utility room for the Mrs, who says I'm not generous). So my question is that there is an electric meter in the way (mine) as I'm building on the front of my garage. Has anyone had the meter moved before (if it even needs moving) and does the incoming supply need moving, and if so how the hell do you organise the whole thing. I have no issues leaving it where it is and having a picture over a cover. I reckon dot and dab + plaster would cover it.
Cheers
Cheers