I finally ran the numbers, downloaded my data for the last 12 months, and also the outgoing Agile rates. Bit of a faff doing it in a spreadsheet, but got there in the end. With my current export pattern Agile export was slightly better than the flat rate, about 1% better over the last 12 months.

To double check I used Octopus Compare, once I'd persuaded it redownload my data, as the first time half my export was missing it came to the same conclusion, in fact both times it was the same conclusion, about 1% better, but for year to date it's almost 3% better, likely due to reduced export in November and December, which will pull it back down.

I'm sure if the system was optimised for Agile it woukd be substantially better.

The big question is, is worth it? I have a system that works very well, and is pretty simple. I'd either have roll my own system or use Predbat or,Victron DESS.

I think even a basic system where I export more in the peak 16:00 to 19:00 hours would payoff, that would be very easy to setup, just involves adding another schedule and target SOC to my current schedules.

Not worth it. Would have to be more than that to be worth the faff imo.
 
I guess most of you missed the bit about optimising the algorithm for Agile export increasing the benefit, it would be a lot more that 1%.

All the data shows based on the current figures is that I'd be no worse off, if I changed tariff and did nothing.

But if I optimised the system, I'd be much better off.

There is two approaches,

1. The simple approach, export more during the morning peak hours, and export more in the evening peak hours.

2. Fully optimise the algorithm to take into account solar forecast, consumption forecast and half hourly rates to optimise export.

Option one is incredibly easy, almost set and forget, but would need different schedules for winter than summer.

Option two is a lot more complicated and relies on forecasting.

I'm also planning on retiring in a year or two, at that point the car will be at home more, and could soak up some summer generation when the rates are low.
 
Last edited:
Yes optimising to dump 10kw 4-7pm with 30kwh of battery is definitely going to be better on agile export. Yesterdays was 31p export

Predbat can do this by telling how much overnight charge and predicting solar to charge battery. Ai can work this out

As you said doing nothing agile still same as fixed export
 
Last edited:
G100 export limit makes a big difference too.

I tried doing some calculations a few weeks ago, but because I have a 5kW export limit, I worked out I would be unlikely to be able to export enough during the short high income window to be worth it, over the full day available at a fixed rate. With a higher export limit, I'm sure Agile would work out better.
 
That is very much the case, the best hours are usually 16:00 - 19:00, the more you can export then the better, it certainly favours larger systems with corresponding export allowance.

I have an 8 kW inverter on the batteries, and a separate 3.68 kW on my old FITS system, with a full G99 for 11.68kW export. Knew I should have gone for the 12kW Quattro, but it was a lot more expensive.
 
It’s 99% a loose connection.
Installer said the same when fixing it, that for some reason they've obviously not got it fully tight. Porblem was with it in the garage, they arent in there enough to smell it slowly going.

All sorted now, came down on Saturday to finish it as had to order a new meter unit.
 
Last edited:
That is very much the case, the best hours are usually 16:00 - 19:00, the more you can export then the better, it certainly favours larger systems with corresponding export allowance.

I have an 8 kW inverter on the batteries, and a separate 3.68 kW on my old FITS system, with a full G99 for 11.68kW export. Knew I should have gone for the 12kW Quattro, but it was a lot more expensive.
Weirdly, you may actually have got a worse export allowance then. When we applied for my G99 I already had 3.68kW allowance for the original inverter, so they just gave another 6kW for 9.68kW total export with the 12kW inverter.

Someone up the street went for the same 12kW inverter from scratch and just got the 6kW allowance.
 
I know I could have got more, as originally I was going for a larger setup with different inverters, can't remember what it was, but I know it wasn't an issue. My location helps, and there was very little solar on other houses at the time, there still isn't much about.

PS I've switched to Agile Outgoing, this is going to be interesting.
 
Last edited:
I know I could have got more, as originally I was going for a larger setup with different inverters, can't remember what it was, but I know it wasn't an issue. My location helps, and there was very little solar on other houses at the time, there still isn't much about.

PS I've switched to Agile Outgoing, this is going to be interesting.
Be interesting to see how you get on. Is your DNO max 8kW?
 
Be interesting to see how you get on. Is your DNO max 8kW?

It will be interesting, tonight's peaks at 32.37p, with today's average at 21.19p.

I think it's these shoulder months that really help to offset the summer lows.

I have an 8 kW inverter on the batteries, and a separate 3.68 kW on my old FITS system, with a full G99 for 11.68kW export.
 
has anyone had a system installed to work when there are power cuts?


i cant remember the last power cut we had but have been thinking about it. our installer i think said £1.5-£3k depending on what you have.

we have an install date of 16 Nov:

16 x 480w panels, 10k battery, 6k inverter
 
has anyone had a system installed to work when there are power cuts?
some inverters have a "gateway" functionality where it automatically switches from grid-tied to isolation-mode so your home will remain powered in the event of a power cut
realistically if you're living in an urban area, this probably isn't needed

if your inverter does not have a gateway, then a physical isolation switch can be installed by the installers, quoting £1.5-3k is a bit steep though
i remember spectra solar (my installers) quoting £450 for this isolation switch - i did not install on mine though
 
I’ve got a gateway with automatic changeover in the event of grid loss.

It’s a nice toy but in reality I’ve had a handful power cuts in 3 years which generally lasted less than an hour in total.

Your milage may vary.
 
I have a Sigenstor system and the Gateway was £1,400 more, I actually think this is reasonable as it must be quite a lot of work to install, it’s a full house backup system.

I did not get as I have not had very many power cuts in my area, I think maybe 1 in 10 years but I would not hestitate to get if I have more frequent power cuts.
 
It’s a lot more work to install and the u it’s cost £700-£1000 to buy depending on brand.

They require the main meter tails to be diverted into them and back out to where they came from. Just the 3m 25mm tail pack is £60 and you need two of them if you’re lucky. If you are unlucky, you have to use 25mm SWA at £20/meter plus glands etc.
 
Last edited:
It's not so bad, makes your house a big UPS, UPS cost a lot of dough for a computer never mind a whole house. My UPS kept my routers and essential things up for a measly 30-40 mins today shame I was down for an hour :( Still did its job.
 
Last edited:
Damn...good thing I am not on a life support machine! If i ever want the island-mode functionality I'll probably cheap out and just get the physical isolation switch :cry:
 