not worth it for the amount of babying required tbhBut as Ron set out, there isn’t actually that much in it and you have to be ‘on it’ constantly.
not worth it for the amount of babying required tbhBut as Ron set out, there isn’t actually that much in it and you have to be ‘on it’ constantly.
I finally ran the numbers, downloaded my data for the last 12 months, and also the outgoing Agile rates. Bit of a faff doing it in a spreadsheet, but got there in the end. With my current export pattern Agile export was slightly better than the flat rate, about 1% better over the last 12 months.
To double check I used Octopus Compare, once I'd persuaded it redownload my data, as the first time half my export was missing it came to the same conclusion, in fact both times it was the same conclusion, about 1% better, but for year to date it's almost 3% better, likely due to reduced export in November and December, which will pull it back down.
I'm sure if the system was optimised for Agile it woukd be substantially better.
The big question is, is worth it? I have a system that works very well, and is pretty simple. I'd either have roll my own system or use Predbat or,Victron DESS.
I think even a basic system where I export more in the peak 16:00 to 19:00 hours would payoff, that would be very easy to setup, just involves adding another schedule and target SOC to my current schedules.
Installer said the same when fixing it, that for some reason they've obviously not got it fully tight. Porblem was with it in the garage, they arent in there enough to smell it slowly going.It’s 99% a loose connection.
Weirdly, you may actually have got a worse export allowance then. When we applied for my G99 I already had 3.68kW allowance for the original inverter, so they just gave another 6kW for 9.68kW total export with the 12kW inverter.That is very much the case, the best hours are usually 16:00 - 19:00, the more you can export then the better, it certainly favours larger systems with corresponding export allowance.
I have an 8 kW inverter on the batteries, and a separate 3.68 kW on my old FITS system, with a full G99 for 11.68kW export. Knew I should have gone for the 12kW Quattro, but it was a lot more expensive.
Be interesting to see how you get on. Is your DNO max 8kW?I know I could have got more, as originally I was going for a larger setup with different inverters, can't remember what it was, but I know it wasn't an issue. My location helps, and there was very little solar on other houses at the time, there still isn't much about.
PS I've switched to Agile Outgoing, this is going to be interesting.
Be interesting to see how you get on. Is your DNO max 8kW?
I have an 8 kW inverter on the batteries, and a separate 3.68 kW on my old FITS system, with a full G99 for 11.68kW export.
some inverters have a "gateway" functionality where it automatically switches from grid-tied to isolation-mode so your home will remain powered in the event of a power cuthas anyone had a system installed to work when there are power cuts?
Still did its job.