I dry laid it with all the cut pieces.
The adhesive instructions say only to do 1 square metre at a time.
Primed the self levelling compound with SBR
And laid the first square metre.
And this is where I am up to before the fumes and sore knees got to me.
There’s a few small gaps here and there but I have to say I’m pretty please with myself.
Still haven’t decided what varnish to put in the floor, thought maybe Ronseal diamond hard satin.
Anyone have any recommendations??