• Notice regarding image hosts and attachments. See here.

What "man jobs" have you done today?

Whats your ultimate plans for these 2 "cupboard" sized bits?

Just storage as I don't have a garage. Already fitted shelving to the left side which used to be a toilet. I'll also store my compressor in here on the left and hang some tools on a batten on the right side.

1000021309.webp


The right side is more shallow than the left, it used to be a coal shed. Either more shelves or I will use it to store my scaffold tower and ladders.

If I ever went for battery storage at this house (unlikely) it would be a good place to put them.

I'll also have a hook on the ceiling that I can use to hang my drysuit and bcd from after going diving, to dry.
 
Last edited:
Now praying that the fitters turn up this morning as promised.
Guess what, they're not here. The living room carpet apparently arrived damaged, but they're still coming to do the stairs, upstairs hallway/landing, and our boys room. There's furniture everywhere, exposed carpet grippers, and he'll be back form School in a few hours. Not impressed at all.

If they're not here soon I'll have to get the strips of carpet I'd left on the grippers, not a huge job but annoying to have to do it.
 
outdoor kitchen fully removed and will be rebuilt elsewhere and then over the christmas period the rest of the decking and roof structure will be removed, level and then rebuilt from ground level. so no more raised decking and less steps to get mucky, wet and slippery over winter

IMG_20260920_122100.webp
IMG_20261031_111635.webp
IMG_20261101_140646-1.webp
IMG_20261102_113706.webp
 
Last edited:
@Firegod
I would get the exposed copper wires addressed too, as that definitely doesn't look safe. The sparky has been lazy and has either trimmed too much insulation from the wire and not bothered to shorten the exposed wire, and/or they haven't pushed the wire in far enough so that the insulation meets the terminal block.
 
@Firegod
I would get the exposed copper wires addressed too, as that definitely doesn't look safe. The sparky has been lazy and has either trimmed too much insulation from the wire and not bothered to shorten the exposed wire, and/or they haven't pushed the wire in far enough so that the insulation meets the terminal block.
Made it safe for now. Got a new neutral terminal block on order for tomorrow yeah, and I'll get them sorted. Can't find a spare square d terminal cover so will have to reuse the old one. Going to look at costs to replace the whole setup as quite old now.
 
Replaced white plastic light and power sockets in our bedroom to new shiny metal ones, as well as the RJ45 jack for the Apple TV. It's been negotiating down to 100 Mbps, no great issue as most stuff it's used for doesn't require anything more but for larger OS updates it was taking a while. When I ran the cable from the loft I ran a pair, so just switched it over when installing the new faceplate and now have 1 Gbps again.
 
The more I do around the house the more shoddy work I find. It's a new build (from 2017), but the amount of shortcuts they take is ridiculous.
I had an extension done and the builder used 100 paslode nails to hold up 3 pieces of wood and forgot to put down insulation under some of the floor.
 
Carpets went in on Monday, so put the doors again after some 'sanding/cutting' adjustments, we need to touch up some paint, spend some time adjusting the doors etc.

7wvPG8rS


Not overly impressed with the carpet fitting, or the company who supplied it all, will be heading down after they are apparently doing the living room later today (it was meant to be Monday!).
 
Rafters, all up, noggins in. Going to have to do more block work now I think. Thinking about an extension for the first floor for the front of the garage(where the side door is inside) as there is a large space there which can be used for filling full of stuff I should throw out but keep just incase I need it in 30 years time.
 

Attachments

  • IMG_3170.webp
    IMG_3170.webp
    264.1 KB · Views: 18
Last edited:
Wired up a Shelly smart meter to check house load and Heat Pump load. Also having a couple of solar panels being delivered from City Plumbing tomorrow. Ready to connect to an Ecoflow micro inverter.
 
Sorted out the loft. Horrible and dusty, but we’ve now got a car load ready to go to the tip, a load to charity and thankfully a lot less to keep! Quite pleased I managed to clean up an Ikea Poang chair and with a nice new cushion it’ll live to fight another day!
 
Neighbour had a tree fall on their house and offered the wood for free to neighbours! So 4 car loads later I have our empty wood store now replenished!

Only problem is I currently have a hernia, so probably shouldn’t have been carrying all the wood anyway, but splitting is off the cards for a good while until I can get surgery and recover. So nice to see it full again though! :)

IMG_4262.webp
 
Took the handrails and spindles out from our staircase.

Anyone explain how this works?
A nail, point out in each spindle. As if somehow it's gone from one end to the other.
 

Attachments

  • 2635.webp
    2635.webp
    77.8 KB · Views: 21
Took the handrails and spindles out from our staircase.

Anyone explain how this works?
A nail, point out in each spindle. As if somehow it's gone from one end to the other.
At a guess the spindle is possibly in 2 parts…

Although if it’s every spindle up the stairs, then it’s more likely they were manufactured like that - no heads on the nails

Edit - or maybe they were nailed at an angle then the hole was filled
 
Last edited:
Back
Top Bottom