Permabanned
- Joined
- 15 Sep 2010
- Posts
- 2,691
Hi, I have just bought a 920 and have read that the software needs to be installed before the cooler.
This would not be a problem if I was just going to change from my corsair A50 but i am waiting for the z77 mobo's and ivy bridge before installing.
So does this mean when I install my new mobo and processor I will have to reinstall my A50, install the 920's software then remove the A50 and attach the 920?
Sorry for the long question but it will be a pain if i have to do the above.
Any advise would be very much appriciated. Thanks
This would not be a problem if I was just going to change from my corsair A50 but i am waiting for the z77 mobo's and ivy bridge before installing.
So does this mean when I install my new mobo and processor I will have to reinstall my A50, install the 920's software then remove the A50 and attach the 920?
Sorry for the long question but it will be a pain if i have to do the above.
Any advise would be very much appriciated. Thanks

