Hi All,
I am in the middle of rewiring my house and have ran network cables to each room and plan on terminating them into a patch panel in the loft.
I have bought faceplates and RJ45 modules for each room and a 8 port patch panel for the loft, I am about to punch the cables into the modules and patch panel but I am bit confused as to what order they go in.
I have taken pictures of each item, could anyone help me make some sense of them before I make a start;
Instructions that came with modules,
Back of patch panel,
Back of modules,
Sorry if I sound like a complete novice but this is my first time doing this,
Any advice would be great,
Thanks, Sam
I am in the middle of rewiring my house and have ran network cables to each room and plan on terminating them into a patch panel in the loft.
I have bought faceplates and RJ45 modules for each room and a 8 port patch panel for the loft, I am about to punch the cables into the modules and patch panel but I am bit confused as to what order they go in.
I have taken pictures of each item, could anyone help me make some sense of them before I make a start;
Instructions that came with modules,

Back of patch panel,

Back of modules,

Sorry if I sound like a complete novice but this is my first time doing this,
Any advice would be great,
Thanks, Sam