- Joined
- 13 Apr 2010
- Posts
- 18,482
- Location
- Sunny Sussex
Pint of milk and a bike
Snap! Bi-folds should be fitted very soon and new supply was moled most of the way, luckily had clay soil
I feel somewhat distressed at the sight of pineapple on pizza![]()
You devilTreated myself to another set.
I used to use matte clay/paste until I discovered styling powder (Slick Gorilla) seriously good stuff.Haven't bought any hair 'product', bar shampoo, for over 30 years.
![]()
And I still don't know who Matt Clay is.
Yay! Our doors go in tomorrow
They had to excavate the verge and across the bottom of the drive to the next pole down. Thankfully they have moled from the verge, across the top of the drive to the new meter cupboard.
Switch over day and overhead cables down tomorrow
It was nom![]()
I use gorilla glue. I haven’t needed to comb my hair for 3 yearsI used to use matte clay/paste until I discovered styling powder (Slick Gorilla) seriously good stuff.
Me too!I feel somewhat distressed at the sight of pineapple on pizza![]()
I use gorilla glue. I haven’t needed to comb my hair for 3 years
Having one set of doors in living room, then another set in a orangery extension that should have started this month. Having a full re-wire just have old unit and two sockets connected till July, plus all new central heating. Ripped everything out lol.
![]()
![]()
Nice, looks good.
We're about 2 weeks from completing our kitchen extension / new kitchen - had some serious disruption over the last 10 / 11 weeks but will be with it when we're finished
You will have to send me some finished pictures, the orangey will be open plan into kitchen so will be ripping old kitchen out. Be interesting to see what you have done.
Careful with this. You need to ensure the standmount tube is sufficiently insulated to prevent interference from the stand's natural resonance.You can tuck the speaker power cable in through the standmount tube surely? Or cable tie them to the back of the tube anyway so they are out of sight![]()