Week 9 draws to a close, and the progress isn't that exciting really.
There's a trench outside now which'll form the foundations for the retaining wall that'll form the front of our little patio area:
We've now got the waste pipe for sinks, dishwashers etc:
The outside where the back door was moved and a window has been created, has now been scratch coated ready for the last coat of render:
We've now got more floor:
You can see the waste pipe sticking up in this one:
This weekend we're going to be painting some of the plastered area, just to get it prepped ready for the kitchen to go in on that side, and I think the builder is going to come in to dig in the gully and the rest of the soakaway so that's ready for our guttering to eventually go in.
Then for week 10, we are hoping to:
- Shell out the utility room with plasterboard and get it ready for installation of the new utility stuff
- Concrete in the foundations for the retaining wall outside
- Demolish our downstairs toilet (

) doorway so that we can bring it out a little bit and extend it (more dust!)
- Start putting the kitchen cabinets together
- Plaster out the rest of the extension
I don't know how much of that is actually going to get done, but it would be good to get cracking on it.
We also heard back from the kitchen company, and our worktops won't get templated until the 5th September, so there's going to be a bit of a delay we were hoping to avoid. It is what it is.
Also bummed out that our flooring quotes are LOL (Between £6k and £8k) so having to re-assess what we're putting down! Still not worked that out yet.