Hitting that point now where builders are still there most days, but not seeing much movement between visits. Met the builders last Friday to discuss electrical sockets etc. Ended up getting 4 A3 sized blank floorplans and i split them by
Lights/Switches
Sockets
Cat6
Speaker Cables
Hoping i didn't miss anything!
The pool pump/outdoor toilet is up. Still not entirely sure why they built to the same height as the house as it looks a little daft, but perhaps it'll be fine once finised/rendered. Initially it was pump room on the left and toilets on the right, but i'm debating building a small addition at the back for the pump, and turning the bit on the left into a sauna. I've currently got a wooden outdoor sauna but it's not insulated and is losing massive heat at the moment. The plan was to use it in the garage, but this place might be better.
Support for the terrace is also now removed which is cool as it shows the full size of it. I do wonder if we'd have been better to have a middle support and then had external blinds we could use on super sunny days
Curious what these vents are. There's 6 throughout the house. I had assumed they were for the central air system, but then looking at the roof it seems there's a slope down towards them. That suggests it's more drainage based, but not sure why they'd come into the house. Anyone got any guesses before i chat to the builder?
Got told the insulation on the roof and subfloor should be done this week/early next and then they'll finish for Christmas.