Soldato
Wonder how much capacity the power infrastructure has too if everyone decided they wanted 3 phase chargers
my house for example has a loop into my house then out to next door. No idea what that means for the future if both of us get EV chargers
They don’t have enough now, and that’s why they’re building power generation as fast as possible. If you’re looped, you’ll have to be unlooped, and the good news is your DNO is currently doing that work FOC.
Last edited: