256 exchanges to be enabled from June 2010 onwards

My exchange is listed there - Cuckoo Oak - I had rang up adsl24 asked James when will C&W adsl2+ LLU will be enabled at my local exchange and he say it will between July and October 2010. I am currently with Plusnet up to 8Mb in Plusnet Pro getting good speed all times at 7.16Mbps. Closer to 7150K.



Look like I will be getting around 16Mbps when ADSL2+ come to my exchange soon :)
 
831612579.png

That's a pretty good speed that was ! Am I right this is talktalk pro ? How far away from your exchange ? as mine is 1511 metres away from my exchange. Currently getting 16dB on downstream line attenuation.
 
I know the feeling, it a pity that BT are always choose which exchanges get it and which exchanges will not get it. I never like BT myself since BT went private by Thatcher's year.
 
The first batch of 28 exchanges will go ahead this month following by another 66 exchanges between July and September in the 2nd batch and the rest (3rd batch) will be between October and March 2011. But there is no details yet of which exchanges (28 of it) will be the 1st batch as C&W remain kept quiet of it.
 
Back
Top Bottom