It would be great to get some in Europe too, just in case.![]()
TSMC Accelerates Fab 21 Expansion, 3nm Production Set for 2027
TSMC is accelerating the rollout of its second-phase semiconductor fabrication facility, bringing forward timelines for advanced node production. The expansion at Fab 21 is now expected to begin equipment installation in October 2026, with initial production lines coming online in the first half...www.guru3d.com
And now it's "damn, could use 128GB!".