Our SMET 2 gas meter stopped providing readings to EDF in June of this year. When I checked it, button B, it showed Locked and would new be for over 1000000 hours, or something. That never changed.
After lots of back and forth they sent an engineer to replace it on the 18th July, but then denied him permission to do the job when he turned up.
Today, 28th August, the arranged visit by another engineer occurred, Morrison on behalf of EDF. He decommissioned the old one.
Commissioned the new and then swapped them over.
He reckoned it is working and should start to display the IHD info within an hour or two.
It isn't doing.
Not sure how long they should take before they should be working.?
Electric meter is sending info every 30 mins
When they work they are most useful. The downside for me is talking to EDF when they don't work....... It is so hard.
After lots of back and forth they sent an engineer to replace it on the 18th July, but then denied him permission to do the job when he turned up.
Today, 28th August, the arranged visit by another engineer occurred, Morrison on behalf of EDF. He decommissioned the old one.
Commissioned the new and then swapped them over.
He reckoned it is working and should start to display the IHD info within an hour or two.
It isn't doing.
Not sure how long they should take before they should be working.?
Electric meter is sending info every 30 mins
When they work they are most useful. The downside for me is talking to EDF when they don't work....... It is so hard.
Last edited: