Associate
- Joined
- 4 Apr 2006
- Posts
- 509
- Location
- Norwich
Hi all
a mate of mine is tempted to geta pre built system from OCUK,
hes a system builder himself but would like to treat himself to a pre built system to save himself the hastle (and to get a guarantee)
but one thing he is wondering about is how much effort do OCUK go to with things like cable management? do they make the inside tidy the way you would with your own system or do they just get them made as fast as possible and cable any old how?
any info would be appreciated
thanks
Loki
a mate of mine is tempted to geta pre built system from OCUK,
hes a system builder himself but would like to treat himself to a pre built system to save himself the hastle (and to get a guarantee)
but one thing he is wondering about is how much effort do OCUK go to with things like cable management? do they make the inside tidy the way you would with your own system or do they just get them made as fast as possible and cable any old how?
any info would be appreciated
thanks
Loki