city fibre

Permabanned
Joined
7 Aug 2017
Posts
2,141
Location
by the tower the one up north ..
so .. does anyone know how long it takes from them laying the fibre to it going live ?
soon to have 500mb .. i hope :)
 
 
Back
Top Bottom