I have a raised garden to dig out. The area I want to clear is approximately 16 x 12 (feet) and about a foot deep.
I have somebody who wants the soil to level their garden, so that's being taken away for me.
How much work do we reckon the above would be with a mini digger or similar device? Access is no problem, there's a driveway in front of the area to be dug and the existing shed is going.
I thought about doing it by hand but I can see that taking forever.

I have somebody who wants the soil to level their garden, so that's being taken away for me.
How much work do we reckon the above would be with a mini digger or similar device? Access is no problem, there's a driveway in front of the area to be dug and the existing shed is going.
I thought about doing it by hand but I can see that taking forever.