Hi guys. I have a BT engineer coming to switch me over from VM to Plusnet fibre. On the same day a Sky engineer is booked to install my dish/Q etc.
My VM contract doesn't expire for another 2 weeks after this date, and I read that the Sky engineer needs a working internet connection to check everything is ok.
I was hoping somebody could talk me through what exactly is going to happen here. Will my VM connection cease to work once the BT engineer flips his switch for Plusnet or will I in effect be able to run both connections simultaneously?
I wanted to book them on the same day so I only have to work from home once, but now slightly paranoid the Sky guy is going to want to check everything and my VM will be dead and the Plusnet not up and running
My VM contract doesn't expire for another 2 weeks after this date, and I read that the Sky engineer needs a working internet connection to check everything is ok.
I was hoping somebody could talk me through what exactly is going to happen here. Will my VM connection cease to work once the BT engineer flips his switch for Plusnet or will I in effect be able to run both connections simultaneously?
I wanted to book them on the same day so I only have to work from home once, but now slightly paranoid the Sky guy is going to want to check everything and my VM will be dead and the Plusnet not up and running