Estimate vs fixed price for building work

Soldato
Joined
25 Jul 2010
Posts
4,149
Location
Worcestershire
We have some building work underway on the house which is being done by specialist carpenters as its a timber frame property.

We agreed a scope of work which was to rebuild a gable end wall which was in dire need of doing, and took them up on a fixed price which we had money in the bank for so knew we could afford. We kept 15% on top of that in case of further issues. We tried to keep more but you know, cost of living etc etc.

A good chunk of the work is done, but they've determined that the gable rafters also need replacing (in their current state, on of them is essentially a member in two parts which is undersized to start with and dodgily connected together), which in their mind is part of the roof structure rather than the wall so wasn't include in the original quote. This is one thing.

However when this was discovered about 3 weeks ago, he said the wood would be about 600 and then it would need a crane to get it in, but that would cost in the hundreds rather than thousands. We said OK, that doesn't sound too awful, send us a quote please for the job lot for us to consider. Meanwhile he put the wood on order.

Finally after us pressing we get an estimate last Friday for an amount that is 50% of the original quote - not a small sum of money. The email stresses that this should be on the high side and the job should very likely come in less than this.

This estimate is a lot, and not really affordable. We'd have to look at liquidating some things and doing a payment plan, which is all not very appetising especially given its basically a time and materials basis and we're in the lap of the gods as to the overall price. We communicated this and said we need some more certainty before we can continue, and that's more than and if than when. However they are adamant the work is essential and the roof isn't safe without doing it.

We asked if they can give a fixed price but they said that would have to be higher than the estimate, is that not very odd if they are describing the estimate as extremely high end?

We've had a really high level of trust until this point, the work done is great and they worked on the house previously and have lots of good references. But I think they are mismanaging this and it's putting us in a very awkward position.

They can't conclude the original scope until finishing the roof (in his mind) so we can't even look at getting someone else in really.

As of today he's on hold while we work this out and possibly losing working time.

Just looking for any general input on how to proceed. We knew it wasn't a risk free job, but at the same time by replacing the entire wall we really thought we wouldn't end up on the hook for anything like this.
 
Thanks for thoughts so far. Getting in someone who is qualified at such short notice will be tricky but it may be necessary to halt things to allow us to do that.

Just had an email back with a fixed price that is 30% higher than the "high end" (in their words) estimate value. So on the one hand they are telling us it's probably going to be less than the estimate value and the scope is well known (his words to me on site) and on the other, things are so uncertain that so quote fixed price we are looking much higher again. I am fully aware of why and how much higher you need to quote for fixed price, but the fixed price is just flat out well out of the range of affordability. Pretty miserable stuff!

Have just had to ask them to reconsider any other approaches that might be less invasive and therefore cheaper. And while not optimal, might still be feasible - i.e. A bit of a bodge job but that's all we can manage now. I am somewhat hopeful as I think he's resisted that approach so far due to having ordered materials and arranged crane etc, but that's his risk not mine as I never gave the go ahead for this extra work.

The other aspect is, if he's giving an estimate rather than a fixed price, am I entitled to have the materials itemised and know the daily rate per man that I'm being charged? I know this will appear high as it needs to cover indirect costs too, but just want to know what's normal practice on that.
 
Last edited:
If it's a fixed price job you'd expect them to keep going at their cost for any issues that were blatently visible.

It would be a bit odd for them to supply man days and day rates on a fixed price job; in my experience.

Are you sure you are getting a proper fixed price job and not just a chancer? I'd expect written terms and assumptions for a fixed price job.
The issue was definitely not visible ahead of the work done so far, that's the problem. They did semi invasive investigation for us at no cost before which showed up enough problems to warrant the original scope. But you never could have expected to find this issue until you got properly stick in.

They aren't providing day rate on a fixed price, they are just wanting to do the further work outside of the original scope on a time and materials basis.

He is by no means a chancer, he is a great bloke but we are just struggling to find a way forward here.
 
Reading your subsequent posts it seems like you took them up on a fixed price which presumably also has this 30% 'premium' just in case they find some hidden nasty that wasnt obvious? Otherwise why pay 30% more? Tricky..
At that point it depends if you classify a gable rafter as part of the roof or part of the wall, as the original quote covered wall but not roof. Note the building has 3 large trusses along the length, it isn't made up of a large number of flimsy trusses with small sections like modern houses.

All fixed price quotes should have contingency in for the contractor (to cover risk), as well as having to build on profit and indirect costs, that's standard and I know that.

Feeling increasingly like I'm just going to have to take the plunge and scrape together what I can and hope. Goodbye savings hello debt...
 