Soldato
- Joined
- 7 Mar 2005
- Posts
- 19,605
- Location
- LU7
I've got some graphs I need to do for an assignment. Now I've done them to an acceptable level for me but I'd like to improve them if possible.
I've got some traceroute results to display and I've done that as I've said but they could be improved if I were able to edit where the bars start from.
At the moment all the bars in my bar chart start from 0ms but where the lowest time is say 67ms and the highest is 75ms for example, I'd like the bar to start at 67ms not 0ms and carry on to 75ms. Does anyone know how to do this with Excel 2000 or 2007? If not it isn't a problem as the graphs have been done but its just for aethetics really that I'm looking to do this.
I've got some traceroute results to display and I've done that as I've said but they could be improved if I were able to edit where the bars start from.
At the moment all the bars in my bar chart start from 0ms but where the lowest time is say 67ms and the highest is 75ms for example, I'd like the bar to start at 67ms not 0ms and carry on to 75ms. Does anyone know how to do this with Excel 2000 or 2007? If not it isn't a problem as the graphs have been done but its just for aethetics really that I'm looking to do this.