COMPOSITE COSTING SHEET (Excel Document)
Client:				Your Ref:
				Our ref:
				Date:
	Quotation for Geotechnical Investigation and Preliminary Geoenvironmental Assessement
	For	At
Anticipated Scope of Investigation:
Item	Brief Description	Prov.Qty	Unit	Rate £	Amount               £
A. GEO DESK STUDY, RECONNAISSANCE, CONCEPTUAL MODEL 				    A. SUB TOTAL
1	Geoenvironmental Desk Study	0	Sum	450	0
1.a.	Coal Mining Archive Report	0	Sum	100	0
2a.	Site Reconnaissance	0	Sum	250	0
2b.	Conceptual Model	0	Sum	150	0
B. ENGINEERING DIRECTION, SUPERVISION, REPORTING				   B. SUB TOTAL
3	Project/Senior/Engineer/Geologist.	0	Day	275	0
	Organise(  ), supervise(  ), schedule (  ), Compute (  ), interpretative report (  ).
4	Associate. Manage/direct(  ) report(  ).	0	Day	375	0
5	Principal. Special advice	0	Day	475	0
6	Geotechnician. Monitor, sample, enter data	0	Day	175	0
7	Consultant. Special advice	0	Day	500	0
8	Car Travel (   Trips at      mls)	0	Ml	0.6	0
9	Accommodation and subsistence	0	Prov.Sum		0
10	Collate Reports(     copies @ £     )	0	Prov.Sum		0
C. UNSHORED MECHANICAL TRIAL PITTING				   C. SUB TOTAL
11	Mob/Demob Excavator plus Operator	0	Sum		0
12	JCB Backhoe, Mini or Micro Digger (8hr day)	0	Day	200	0
13	Breaker Attachment	0	Day	75	0
14	Simple 3m Gas Standpipe (Push)	0	No.	25	0
15	Project/Senior/Geologist supervision (inc.travel)	0	Day	325	0
			CARRY FORWARD
			BROUGHT FORWARD
D. CONVENTIONAL LIGHT CABLE PERCUSSION BORING				   D. SUBTOTAL
    (Based on Jackson, Apex or P.Brine Rates)
29.b	Project/Senior/Geologist supervision (inc.travel)	0	Day	325
E. ROTARY CORE DRILLING				   E. SUB TOTAL
   (Based on Jackson, Tor or Apex Rates)
39b.	Project/Senior/Geologist supervision (inc.travel)	0	Day	325
F. STANDPIPES, PIEZOMETERS, MONITORING				   F. SUB TOTAL
40	Simple Standpipe (push)	0	Each	20	0
41	Piezometer/Monitor Well (screw)	0	M	25	0
42	Simple Lockable Cover in concrete	0	No.	40	0
43	Technician to Monitor and Water Sample	0	Visit	225	0
44	Transport Well Materials (S+A Rig)	0	Visit		0
45	Transport Well Materials (Rotary Rig)	0	Visit		0
46	Transport Well materials (Window Sampling)	0	Visit		0
47	Photoionisation Detector (PID)	0	Day	75	0
48	Piezo Tip/Gas Valve Assembly	0	No.	25	0
G. ROTARY PERCUSSIVE PROBE DRILLING				   G. SUB TOTAL
   (Based on Apex or Celtic Rock rates)
53	Project/Senior/Geologist supervision (inc.travel)	0	Day	325	0
H. WINDOW SAMPLING/DYNAMIC PROBING				   H. SUB TOTAL
   (Based on Jackson, Apex or Tor Drilling Rates)
59	Project/Senior/Geologist supervision (inc.travel)	0	Day	325	0
J. LABORATORY TESTS				   J. PROV SUM
60-64	Classification (NMC,PI,Sieve,Hydrom)
65-71	Chemical (SO3, PH,Cl-)
72-78	Strength (Triaxial, Shear Vane)
79-85	Compaction, Rock, Permeability			0	0
K. CONTAMINATED LAND ANALYSES				   K. PROV SUM
	Integrale Generic Suite(  ), Leachate Suite(  ), TPH
	unspeciated(  ), aliphatic-aromatic( ) speciated(  )
	BTEX (  ), VOC's (  ), PAH (  ),  Asbestos (  ),
	PCB's(  ) WAC Tests(  ), Other(  ).			0	0
L. MISC. EQUIPMENT AND SERVICES				   L. SUB TOTAL
	Bowser, Pump, Soakaways Technician	0	Day	300	0
			BUDGET COST		#NAME?
Notes:			(Excl.VAT)
1	Integrale Conditions of Contract Apply.
2	2% discount on Integrale Fees and Disbursements offered for payment within 10 days of invoice.
3	Contingency: 10/15/20% recommended. To cover changes in scope of investigation/rate only items etc.