final check please before i order

Associate
Joined
30 Jan 2014
Posts
1,106
im going to order this tomorro if these are all compatible and look fine


Hardware Labs Black ICE Radiator GT Stealth 360 Hardware Labs Black ICE Radiator GT Stealth 360 £49.99
(£41.66) £49.99
(£41.66)
EK DCP 4.0 Pump (12v) EK DCP 4.0 Pump (12v) £39.98
(£33.32) £39.98
(£33.32)
XSPC Photon 170 Tube Reservoir XSPC Photon 170 Tube Reservoir £37.99
(£31.66) £37.99
(£31.66)
Monsoon 19/13mm (ID 1/2 OD 3/4) Free Center Compression Fitting Six Pack - Orange Monsoon 19/13mm (ID 1/2 OD 3/4) Free Center Compression Fitting Six Pack - Orange £29.99
(£24.99) £29.99
(£24.99)
EK-Supreme LTX AMD - Acetal CSQ - AMD Waterblock EK-Supreme LTX AMD - Acetal CSQ - AMD Waterblock £29.99
(£24.99) £29.99
(£24.99)
Monsoon 19/13mm (OD 3/4) Rotary 45° - Orange Monsoon 19/13mm (OD 3/4) Rotary 45° - Orange £9.49
(£7.91) £18.98
(£15.82)
XSPC HighFlex Hose 1/2" ID, 3/4" OD, 19/12.7mm, 2m, Black XSPC HighFlex Hose 1/2" ID, 3/4" OD, 19/12.7mm, 2m, Black £6.98
(£5.82) £6.98
(£5.82)
EK DCP Mounting Plate Kit with Anti Vibration Mountings EK DCP Mounting Plate Kit with Anti Vibration Mountings

if ive missed anything please let me know or if anyone has any suggestions for alternative parts please let me know.

im also getting a phobya 200mm rad and a fillport but it doesnt look as tho OCUK sell them
 
if you are just cooling the CPU, you can drop one of the rads and up the block to a Supremacy. Personally would replace the Black ice rad with a EK pe rad. But if you can afford to splash cash on more rads, the more the merrier!

Also two rads, one block, pump and reservoir requires 10 fittings, you have only a 6 pack.

If you need a fan for the 200mm, get the Sivlerstone ap121 and put it in push. Insanely powerful fan which is capable of delivering a lot of air and static pressure and even has its own pci slot fan controller.
 
Universal mounting, better temps, higher flow. The newer supreme mounting plate is integrated to the plexi top now, whereas the supremacy has a metal inter-changeable plate depending on what socket you want to put it on.

The temp difference wont be huge but its the difference between entry level block and a top range block for just a score more.

There are so many variations, ill just link the search. *ignore the kits and the motherboard/cpu combo blocks and vga blocks*

http://www.overclockers.co.uk/search_results.php?keywords=supremacy&_=1391192834913
 
The PE rads should be closer tot eh 40mm mark, where as the older EK XT rads were 47mm.

I cant remember the radiator clearance of the 600t but if you put the fans on the outside oft he case you might have some room. I know the 35.5 xspc fit on the roof with fans on the outside.
 
Thanks I may hold of ordering till the middle of the week until my case arrives so that I can measure the distance before ordering. Don't want to end up with rads that don't fit.

Are the rads I chose not much use
 
they are good but in terms of performance for value, i would say the PE rads are the best rads money can buy for that price. I would say its worth waiting a few days if that means the difference between getting good rads and the best you can buy for the money.
 
Between the 2 rads mentioned what sort of temp dif is there between the ek pe and black ice slim rads? Or is it better flow etc between them? I don't really know the dif and its been 12 moinths since I last built a wc pc
 
The temp difference would be probably around a handful of degrees at full load after you add the GPU to the loop. You also get slightly better flow but that isn't really an issue. Overall i just consider it to be a better radiator for the same price with a nicer aluminium cover.
 
Ive built a few AMD watercool builds myself, trying to really put some bling on red team. I thought it was a bit of a shame that it doesn't really get done often as people usually chose AMD cause of a budget and WCing is expensive.
 
To certain extent budget yes but I can't justify the price of a decent intel cpu and mobo compared to an fx 8350 plus mobo. Bearing in mind I usually get parts over maybe 6-8 weeks from start to finish
 
Last edited:
Back
Top Bottom