Soldato
- Joined
- 18 Oct 2002
- Posts
- 16,149
- Location
- The land of milk & beans
My boss was the same too, but the example I gave him at the time was something along the lines of:I agree but I guess my boss would rather something take longer than have to pay someone else too.
An average site with around 4 templates to be sliced would take us around a day (8 hours) to do. At our quoting rate this is about £700.
Outsourcing meant we could have it done for £100, to AAA compliance level and IE5.5 compatible.
So not only would it save us £600, but it's also a day which can be better used on developing the back-end of the site.
Check this threadMuGeN said:can anyone vouch for them or recommend someone similar?
