1 Mar 2011 at 17:17 #1 anuraj anuraj Soldato Joined 17 Aug 2010 Posts 3,874 Location London Can anyone tell me if it will have the NEC onboard motherboard connector cable for the usb 3 on the front panel.
Can anyone tell me if it will have the NEC onboard motherboard connector cable for the usb 3 on the front panel.
1 Mar 2011 at 18:03 #2 Surveyor Surveyor Caporegime Joined 5 Sep 2010 Posts 25,573 I very much doubt it. I have two of these cases and I've been in touch with Cooler Master regarding these cables. Yesterday they said the cables were on order and should be available from the parts shop in 2-7 weeks (?). If they don't have any for the parts shop I imagine it will be quite a while before they filter through the supply chain to the full product.
I very much doubt it. I have two of these cases and I've been in touch with Cooler Master regarding these cables. Yesterday they said the cables were on order and should be available from the parts shop in 2-7 weeks (?). If they don't have any for the parts shop I imagine it will be quite a while before they filter through the supply chain to the full product.
1 Mar 2011 at 18:14 #3 anuraj anuraj Soldato OP Joined 17 Aug 2010 Posts 3,874 Location London Well will it be done by July
1 Mar 2011 at 18:15 #4 Biz.Kid09 Biz.Kid09 Soldato Joined 14 Oct 2009 Posts 9,657 Location UK anuraj said: Well will it be done by July Click to expand... Why are you asking now if you are not buying until July? There will be more than likely aload more cases out by then
anuraj said: Well will it be done by July Click to expand... Why are you asking now if you are not buying until July? There will be more than likely aload more cases out by then
1 Mar 2011 at 18:19 #5 Surveyor Surveyor Caporegime Joined 5 Sep 2010 Posts 25,573 anuraj said: Well will it be done by July Click to expand... I gaze into my crystal ball and it says "don't ask stupid questions". I suggest you enquire nearer the time from the retailer of you choice (that would be Overclockers UK) or Cooler Master themselves.
anuraj said: Well will it be done by July Click to expand... I gaze into my crystal ball and it says "don't ask stupid questions". I suggest you enquire nearer the time from the retailer of you choice (that would be Overclockers UK) or Cooler Master themselves.