I know the dates on the BT Openreach website should be taken with a pinch of salt but I'm awaiting fibre going live in my area and its got an estimated activation date of 31/12/2012 on the BT site.
Now I know this shouldn't be taken literally as it can vary wildly, but are BT pretty good at sticking to their estimates? OR is it literally just as and when they feel like (i.e. could be several more months?)
I have seen lots of BT Openreach vans in the area digging up roads from the looks of it over the past couple of months so hopefully thats a positive sign.