Permabanned
- Joined
- 23 Nov 2019
- Posts
- 375
- Location
- Scotland
I'm building a Premier Pro editing pc based on Intel.
I now have all the kit, apart from my intended CPU (i9-10980xe) which remains out of stock & has a 150% price loading in retail. I checked with trade distribution & they have suggested a 6 month lead time, although to be fair, they don't really know as they have no ETA from Intel.
With about £4-5k of kit waiting, I'm not sure I want to hang around for 6 months as I need to be editing in the spring.
Should I go instead for something like an i9-10920x or maybe from the older i9-9000x range?
I now have all the kit, apart from my intended CPU (i9-10980xe) which remains out of stock & has a 150% price loading in retail. I checked with trade distribution & they have suggested a 6 month lead time, although to be fair, they don't really know as they have no ETA from Intel.
With about £4-5k of kit waiting, I'm not sure I want to hang around for 6 months as I need to be editing in the spring.
Should I go instead for something like an i9-10920x or maybe from the older i9-9000x range?