From what I saw, It seemed to be planned quite well, the issue is more the site and it's unsuitability for any LOS system, the issue was 'cost'..
The issue of interruption of signal was noted, but all quotes to give better LOS performance needed structures building, as the site is split level, or more then the cost of the groundworks for installing ducting, which had to cross a road carrying heavy plant.
cheers mate for saying that, there is some trffic across the grounds to the weigh bridge & some cranes around the yard so wi-fi is the only route at the moment. thanks