Rebuilding my loop in my Enthoo Primo this week. I've got a new res/pump and the only place I can put it is on the floor. I have a triple next to it and a quad in the roof.
Am I okay to go straight from the floor to the rad in the roof, then down through the CPU, GPUs, into the bottom rad and then back into the res? It would be a two foot run or so, quite long! Or should I go into the rad, then upwards?
Am I okay to go straight from the floor to the rad in the roof, then down through the CPU, GPUs, into the bottom rad and then back into the res? It would be a two foot run or so, quite long! Or should I go into the rad, then upwards?