More team challenges designed to assist in potential future additions to the DC-Vault

Associate
Joined
16 Apr 2014
Posts
85
I have added two new [H] created challenges for the sake of stress testing the projects ability to handle load. I encourage everyone to join in as we are seeing if they are worth adding to the DC-Vault.

http://boincstats.com/en/stats/challenge/team/chat/611 1/5-1/10 - EDGeS
http://boincstats.com/en/stats/challenge/team/chat/613 1/12-1/17 - CONVECTOR

I will possibly add a third project challenge for Gerasim@home later when I get a reply from them and also get the necessary RAC at the project to issue the challenge.

If your team does not wish to join, we will understand. This was mainly to find any issues with the projects that might prove it unworthy of addition and to help us test the server side for heavier load potential.
 
POGS is also planning some big changes in the next few months, so keep it in mind in case they have a few hiccups. Even if you set them as backup projects with priority 0. Every little bit of stress testing will help.
 
Back
Top Bottom