Evening all
Im in deep waters here and completely out of my comfort zone so please go easy on me...
My friend is a construction planner and uses ASTA for tenders and construction programs. His current laptop is not keeping up with demands and I would like to ask for your help in possibly suggesting one that will.
I know to be able to run ASTA the system requirements are as follows..
Operating system: Professional or Enterprise versions (64 bit) of Windows 7, Windows 8, Windows 10
Memory: 8 GB RAM (or 16 GB RAM when using the 64-bit Asta Powerproject client)
Can anyone please recommend a really good laptop that he can use to run the program, have Spotify running at the same time whilst having Indesign as well as a few other programs running similtaniously? Am I looking for something that cant be done?
Im walking in the dark here but hoping you amazing people can help me out.
Thanks in advance!
Im in deep waters here and completely out of my comfort zone so please go easy on me...
My friend is a construction planner and uses ASTA for tenders and construction programs. His current laptop is not keeping up with demands and I would like to ask for your help in possibly suggesting one that will.
I know to be able to run ASTA the system requirements are as follows..
Operating system: Professional or Enterprise versions (64 bit) of Windows 7, Windows 8, Windows 10
Memory: 8 GB RAM (or 16 GB RAM when using the 64-bit Asta Powerproject client)
Can anyone please recommend a really good laptop that he can use to run the program, have Spotify running at the same time whilst having Indesign as well as a few other programs running similtaniously? Am I looking for something that cant be done?
Im walking in the dark here but hoping you amazing people can help me out.
Thanks in advance!