Hi everyone.
I think I can ask this here(?)
I have a bit of a dilemma. The desk I'll have at uni has been cutout for cables, meaning that my tower either has to go on the desk, or underneath it, with the cables coming up and over the desk.
Which would you advise?
And if you choose the latter, what is going to be the best way to sort all these cables out? Bear in mine that some will come from the tower, and the other will be power cables from the sockets above the desk.
Really starting to think that they didn't consider such details when designing the room.
Thanks everyone!
I think I can ask this here(?)
I have a bit of a dilemma. The desk I'll have at uni has been cutout for cables, meaning that my tower either has to go on the desk, or underneath it, with the cables coming up and over the desk.
Which would you advise?
And if you choose the latter, what is going to be the best way to sort all these cables out? Bear in mine that some will come from the tower, and the other will be power cables from the sockets above the desk.
Really starting to think that they didn't consider such details when designing the room.
Thanks everyone!