Any chance of a cost breakdown materials/labour?We have pretty similar setup from Jacksons Fencing. Quality is excellent.
We had a ~20m run with just normal cheap panels and cheap posts, and wind tore it down (not recent storms). So we decided to do it properly. Used finished and treated railway sleepers for the base to keep the gravel back (we had to stack them about 3 high and use big bolts to fasten them). Notched them out so the posts could slide between, then we concrete in the heavy duty slotted posts (but also wrapped the bases going into the ground with joist tape) and then fitted the stronger fence panels between. We didn't use the double sided panels as the neighbour wasn't paying. So the fence is ours.
Turned out alright.
![]()
![]()
We have a similar length run to do. Currently it's concrete posts and panels that are slowly dying. Sadly the posts were put in really badly (previous owner), not in a straight line at all so it both looks horrible and the panels don't fit nicely.
I don't suppose there's anyway to reposition/recycle the posts? Otherwise it's a fair bit of work just to remove them.

