I have my backup server connected to a APC UPS which is running Powerchute Personnel addition.
Its set to gracefully shut down when that battery has hit 90 %
Is there a way of creating a batch file that can be run on this Backup server to shutdown the other two remote PC's on the lan on a UPS but but with broken USB connectivity when the backup server battery reaches 90% ?
I found out today that the other APC UPS the USB has broken since installing a new OS on one of the said PC.
I know the easiest option is just to get another two UPS's for these two machines..But I've not long changed the batteries in it.
Its set to gracefully shut down when that battery has hit 90 %
Is there a way of creating a batch file that can be run on this Backup server to shutdown the other two remote PC's on the lan on a UPS but but with broken USB connectivity when the backup server battery reaches 90% ?
I found out today that the other APC UPS the USB has broken since installing a new OS on one of the said PC.
I know the easiest option is just to get another two UPS's for these two machines..But I've not long changed the batteries in it.