Associate
- Joined
- 2 Oct 2006
- Posts
- 13
- Location
- West Sussex
and now the wait begins 
I ordered the new parts for my rig last night... now have to wait a day or 2 for them to arrive
What I ordered:
Intel C2D E6600
eVGA nForce 680i
Gainward BLISS 8800GTX
Corsair Dominator Twin2X 2GB PC2-6400
Corsair HX 620w Modular PSU
Coolermaster Stacker 830
TT Big Typhoon
(I have HDD's and Optical drives already)
Watch this space for my first attempt at a build log

I ordered the new parts for my rig last night... now have to wait a day or 2 for them to arrive

What I ordered:
Intel C2D E6600
eVGA nForce 680i
Gainward BLISS 8800GTX
Corsair Dominator Twin2X 2GB PC2-6400
Corsair HX 620w Modular PSU
Coolermaster Stacker 830
TT Big Typhoon
(I have HDD's and Optical drives already)
Watch this space for my first attempt at a build log
