tomorrow I should be receiving a mach 2 gt and I was trying to plan out what to do with it. I thought something like this

1. start up before installing to make sure it's working ok
how long should I run it for?
2. remove mobo and install cpu kit + cpu
3. put mobo back in and connect vap head
how long do I have to wait after switching it off from testing before it is safe to start flexing the tube?
4. get to work

is there anything else that I should be doing?
my initial plan is to set it up at the side of my pc60 before i mod the case. Will this work without placing too much stress on the vap tube?
 
cheers.