Soldato
- Joined
- 31 May 2009
- Posts
- 21,457
Guys looking for some advice
At work we have been having very serious slowdowns in a piece of software which stores and recalls records.
We're a dental practice and currently have a HP Proliant ML 350 G5 with 3Gb ram running windows2003 for sbs, there are around 15 workstations(a couple of admin machine 5 reception machines and 8 surgery machines).
All can be in use, but generally usage isn't overly heavy, major DB searches are designed to be run when no one is working, and the slowdowns appear to be specific to our dental software (Software of Excellence Exact program)
There would be light internet usage on the machines, email usage using outlook, through what I assume is exchange on the server.
The server will be 4 years old in the autumn and we've been advised it is time to upgrade then, before it kells over and dies.
Between now and then I will likely increase the RAM by a 1GB and see if that helps matters at all, a cheap option to buy some time.
We've had a recent quote for a replacement server, upgrading to a G6, with 12GB RAM and running SBS 2008 SP2.
Should this give us a considerable improvement in server performance?
Is the quote reasonable?
HEWLETT PACKARD ML350 G6 DUAL PROCESSOR 1 1,122.00 1,122.00
HEWLETT PACKARD 4GB DUAL RANK x4 PC3- 3 200.00 600.00
HP 2610-24G Switch 1 345.00 345.00
HP TV Ultrium SAS TV Drive - Includes 4 extra pieces of media - SAS HBA required when 1 1048.00 1,048.00
HP Ultrium Data Cartridge 400GB 10 25.79 257.90
On-Site Installation and Server Migration 2 500.00 1,000.00
APC Smart-UPS 1000VA USB & Serial RM 1U 230V 1 440.00 440.00
HP 300GB Hot Pluggable SAS Small Form Factor 10 000 rpm 6GB/s Dual-Port Universal Hard 4 435.19 1,740.76
2 - Server Software
CA ARCSERVE BACKUP R15 FOR WINDWOS 1 458.00 458.00
Windows Small Business Server (SBS) CAL Ste 2008 English MLP Clt AddPak User CAL 9 72.00 648.00
Windows SBS Standard 2008 SP2 1pk DSP OEM DVD 1-4CPU Including 5 Clients 1 625.00 625.00
4 - Services
Workshop Prep & Project Management 1 500.00 500.00
On-Site Fine Tuning and Site Admin 1 500.00 500.00
Is that backup system a good one?
I think it is similar to the tapedrive systemms we use currently
Is arcserve good?
Thanks for any input folks.
At work we have been having very serious slowdowns in a piece of software which stores and recalls records.
We're a dental practice and currently have a HP Proliant ML 350 G5 with 3Gb ram running windows2003 for sbs, there are around 15 workstations(a couple of admin machine 5 reception machines and 8 surgery machines).
All can be in use, but generally usage isn't overly heavy, major DB searches are designed to be run when no one is working, and the slowdowns appear to be specific to our dental software (Software of Excellence Exact program)
There would be light internet usage on the machines, email usage using outlook, through what I assume is exchange on the server.
The server will be 4 years old in the autumn and we've been advised it is time to upgrade then, before it kells over and dies.
Between now and then I will likely increase the RAM by a 1GB and see if that helps matters at all, a cheap option to buy some time.
We've had a recent quote for a replacement server, upgrading to a G6, with 12GB RAM and running SBS 2008 SP2.
Should this give us a considerable improvement in server performance?
Is the quote reasonable?
HEWLETT PACKARD ML350 G6 DUAL PROCESSOR 1 1,122.00 1,122.00
HEWLETT PACKARD 4GB DUAL RANK x4 PC3- 3 200.00 600.00
HP 2610-24G Switch 1 345.00 345.00
HP TV Ultrium SAS TV Drive - Includes 4 extra pieces of media - SAS HBA required when 1 1048.00 1,048.00
HP Ultrium Data Cartridge 400GB 10 25.79 257.90
On-Site Installation and Server Migration 2 500.00 1,000.00
APC Smart-UPS 1000VA USB & Serial RM 1U 230V 1 440.00 440.00
HP 300GB Hot Pluggable SAS Small Form Factor 10 000 rpm 6GB/s Dual-Port Universal Hard 4 435.19 1,740.76
2 - Server Software
CA ARCSERVE BACKUP R15 FOR WINDWOS 1 458.00 458.00
Windows Small Business Server (SBS) CAL Ste 2008 English MLP Clt AddPak User CAL 9 72.00 648.00
Windows SBS Standard 2008 SP2 1pk DSP OEM DVD 1-4CPU Including 5 Clients 1 625.00 625.00
4 - Services
Workshop Prep & Project Management 1 500.00 500.00
On-Site Fine Tuning and Site Admin 1 500.00 500.00
Is that backup system a good one?
I think it is similar to the tapedrive systemms we use currently
Is arcserve good?
Thanks for any input folks.