Soldato
This year already there have been 3 lots of road closures with diversions and temp traffic lights for 2-3 days with nothing done on two of them and the other - a hole dug into the pavement! This is with temp traffic lights!
What’s the point of closing roads for no work done and expect people to drive over half a mile more due to diversions? Plus the hole in pavement with temp traffic lights is causing traffic jams and the whole road is gridlocked.
It’s time for contractors to close roads when actual road works are done. Plus there’s been various holes dug up in pavement down this road before without the need to use traffic lights.
All works were planned
What’s the point of closing roads for no work done and expect people to drive over half a mile more due to diversions? Plus the hole in pavement with temp traffic lights is causing traffic jams and the whole road is gridlocked.
It’s time for contractors to close roads when actual road works are done. Plus there’s been various holes dug up in pavement down this road before without the need to use traffic lights.
All works were planned