Sky were scheduled to upgrade my Sky+ to Sky HD today, the letter stated an AM time slot. I arranged with my boss to get the morning off work so I was all set. 
According to the Sky website, the engineer will call either the night before, or before 9 am on the day of installation to confirm what time he expects to arrive...I didn't get a call.
I waited till around 1030, then after the very longwinded automated phone service provided by sky, I got to talk to someone, who confirmed that I should see the installer sometime between 10 and 1. I then got an answer machine message from AVC telling me the installer would be visiting sometime between 10 and 1. I waited....
I waited till 1:30 then rang Sky. 'Due to very high call volumes' they were unable to answer my call, so I listened again to my AVC answer machine message, and used the ring back service to call them direct. Someone answered right away, apologised and informed me that the installer would deffinetly arrive before 4pm. I waited....
The installer arrived at 5:35, apologised for being 'a bit late' and sorted out my HD install. I'm ****ed off for waiting around all day, and having to take a day off work, when I didn't have to. My boss is fuming, as he only expected me away from work for a few hours at most. Who do I talk to for some sort of compensation, and what should I expect in return?

According to the Sky website, the engineer will call either the night before, or before 9 am on the day of installation to confirm what time he expects to arrive...I didn't get a call.

I waited till around 1030, then after the very longwinded automated phone service provided by sky, I got to talk to someone, who confirmed that I should see the installer sometime between 10 and 1. I then got an answer machine message from AVC telling me the installer would be visiting sometime between 10 and 1. I waited....

I waited till 1:30 then rang Sky. 'Due to very high call volumes' they were unable to answer my call, so I listened again to my AVC answer machine message, and used the ring back service to call them direct. Someone answered right away, apologised and informed me that the installer would deffinetly arrive before 4pm. I waited....

The installer arrived at 5:35, apologised for being 'a bit late' and sorted out my HD install. I'm ****ed off for waiting around all day, and having to take a day off work, when I didn't have to. My boss is fuming, as he only expected me away from work for a few hours at most. Who do I talk to for some sort of compensation, and what should I expect in return?
