Hello all.
I've just finished installing a T-line into my system as I have been running a single bay repack res for a while and I find them impossible to bleed. The sloshing noise was driving me crazy so i decided to do somthing about it.
My question is this. Having always used res's to directly fill/bleed my system this is the first T-line installation, I'm not sure how far to fill it. At the moment the liquid is about an inch or two away from the t-connector, is this normal? or should i fill it right to the top? or doesn't it matter?
thanks
matt.
I've just finished installing a T-line into my system as I have been running a single bay repack res for a while and I find them impossible to bleed. The sloshing noise was driving me crazy so i decided to do somthing about it.
My question is this. Having always used res's to directly fill/bleed my system this is the first T-line installation, I'm not sure how far to fill it. At the moment the liquid is about an inch or two away from the t-connector, is this normal? or should i fill it right to the top? or doesn't it matter?
thanks
matt.