well either ive been sent the wrong thing or im not doing it right
does this method still need barbs? im really confused.
is the above method for using standard clamps that i used before or for the fittings?
edit: ive added you on msn got metal in the email addy, any chance you could come on for a couple of mins?
2nd edit: hmm am i right in thinking you fit the comp fitting into the block or whatever, unscrew the bit and slide it up the tubing, push tubing on then screw the thing back down.
if thats the right way then it doesnt actually slide up my tubing not even my old masterkleer 7/16 tubing :s