my 360 came back from MS yesterday they replaced the mother board,i really wanted a new benq drive but never mind.
I also called them 2 days before i sent 360 back with another moan and told them my usb flap fell off, and they said they would send me a new front and it would take about 5 to 10 days,but low and behold 2 days later there was a drop on my door mat, but it was not a new front they had send me but new HD insted
thx MS i have a core 360 and you have just upgraded it for me. 
Should i tell em ? cos poor old bill could do with the money er i think not.
I also called them 2 days before i sent 360 back with another moan and told them my usb flap fell off, and they said they would send me a new front and it would take about 5 to 10 days,but low and behold 2 days later there was a drop on my door mat, but it was not a new front they had send me but new HD insted


Should i tell em ? cos poor old bill could do with the money er i think not.