Quick I'm stuck in life, to the forums again!!
I am building a small shed (kids playhouse) and have already constructed the base see pictures below
However I am not familiar with the rules when using Damp proof membrane.
My intention is to lay the shed floor directly onto the shed base in the picture below using screws, if I lay the DPM on top of that base and under the floor how do I get around the problem that I am now going to be drilling holes in it to fix both the floor down and the shed walls once they are ready to go up ?
http://i.imgur.com/JpmTiBy.jpg
http://i.imgur.com/NyGgp8w.jpg
I am building a small shed (kids playhouse) and have already constructed the base see pictures below
However I am not familiar with the rules when using Damp proof membrane.
My intention is to lay the shed floor directly onto the shed base in the picture below using screws, if I lay the DPM on top of that base and under the floor how do I get around the problem that I am now going to be drilling holes in it to fix both the floor down and the shed walls once they are ready to go up ?