apologies for the lacking of updates.
Been away for a few days with the family so time to update. progress has slowed a little as the flooring was ordered and took a few days to arrive and also a few days to "acclimatise" to the room.
All holes sucessfully cut into the roof/wall for the speakers. Checked all the fittings and they are all good to go.
Some lovely 18m natural oak flooring - running out into the porch as well.
Usual tangle of wires which will be into the cabinets when completed.
Rear Ceiling speaker positions.
New radiator
Another shot of the flooring.
At this stage I needed to get the tv bracket and TV on the wall - Sky engineer is coming on Tuesday so need to get the bracket on the wall asap. Joiner did a good job of putting in some wood struts between the stud work behind the plaster board so that I could potentially screw the bracket straight into the plasterboard/wood behind etc without to much faffing around.
Needed to give the plasterwork a quick coat of cheap white emultion so that it would be done behind the bracket - the rest will be done with a good proper coat or 2 once i get the chance. Room is going to be fairly plain to start with - mainly just white walls for now as due to missus being on crutches, we have not been able to get out and about to find colours/wallpaper/furniture at this stage.
Gratuitous shots of the PS59D6900 mounted on the wall!
A very quick hook up the blu-ray player and all is good!!!! picture quality is superb and very impressed from a very quick viewing. Now all covered up again to allow for completion of flooring in the next couple of days and then lots of painting of walls and ceiling before rest of kit gets sorted out.