Done it, Here is what i brought :D

Associate
Joined
31 Jan 2011
Posts
2,313
Location
Hampshire
Here is what i have brought :D did i forget anything ? This is my first attempt. I hope 2L of fluid is enough and 3M of pipe is enough.




1X EK Water Blocks EK-Supremacy EVO - Nickel

1X XSPC DDC Photon 270 Reservoir / Pump Combo

1X XSPC EX360 Slim Line Triple Fan Radiator

1X XSPC EX140 Single Fan Radiator

2X XSPC - EC6 Non Conductive Coolant - Blood Red

8X XSPC G1/4" to 7/16" ID, 5/8" OD Compression Fitting (Black Chrome)

3M XSPC 7/16" ID [16/11mm] High Flex Hose - Clear

3X Corsair SP120 Quiet Series High Pressure Low Noise

(will be ordering a GPU block for the 970 G1 but not out until tomorrow)

Looking forward to putting it all together, Unfortunately my new case is a Xmas present from the wife so wont be going together until Xmas day ;) Probably wont get time between now and then any way.

Also going to grab a 4790k for the hell of it as some one wants my 4690k
 
2 45º and 2 90º rotaries will be a massive help. There's a chance you may not need them or may need more but at least if you have some you stand a chance. Also have yu though of a drain T?
AN I would use DI water for a while. It's much cheaper and won't stain if you leak/spill any and you're quite likely to want to change bits around over the coming weeks ;)

Also, XSPC do a little temp readout. They're handy :)
 
Never thought of a drain T lol ! What brand of angles do u recommend ?

Good tip on the dis water,

Some from ocuk a lot from else where due to stock
 
x1 http://www.overclockers.co.uk/showproduct.php?prodid=WC-426-BP&groupid=962&catid=2589
x1 http://www.overclockers.co.uk/showproduct.php?prodid=WC-048-BX&groupid=962&catid=2589&subcat=2594

x2 http://www.overclockers.co.uk/showproduct.php?prodid=WC-220-BP&groupid=962&catid=2589&subcat=2594
x1 http://www.overclockers.co.uk/showproduct.php?prodid=WC-221-BP&groupid=962&catid=2589&subcat=2594

Thats a general idea for what you'd need for a drain.

Putting it at the lowest point in the system makes changing fluid literally a 5min job.

Q connector -> male to male -> mini-valve -> stop cap. Top side compression fitting or w/e connection you're using. Last slot -> last stop cap. All g 1/4
 
Back
Top Bottom