
It has taken about two months to do, in my spare time around work and a few busy weekends. I replaced the carpet on the floor and laid down a solid oak floor instead, repainting the skirting board as I went. The walls were a putty colour but have been painted back to white to allow the LED colours from a Lightpack attached to the iMac to wash over them. Office storage was standard stuff from Ikea, along with the floating shelves too.
We were looking for a much cleaner, minimal look than before (I don't have a before picture!) and something that we can both work in comfortably if needed - both of us work from home for a day per week on average. Previously we had a few bookshelves and some filing, and now that's all hidden away in the new cabinets. Also stored inside the cabinets are the router, NAS and Time Capsule along with a printer.
It took longer than I'd hoped, but then again, what renovation around the house doesn't!