On time and within budget would take a miracle here.
On time OR within budget would at least be a step in the right direction

Edit: also inb4 "your mum's is bigger!"

On time and within budget would take a miracle here.
Perhaps you could tell us why Crossrail two is projected to cost £32Bn? Sure, its twice the length of the Gotthard Base, but it's not as deep and costs considerably more than double.
Perhaps you could tell us why Crossrail two is projected to cost £32Bn? Sure, its twice the length of the Gotthard Base, but it's not as deep and costs considerably more than double.
I've no idea. Can't cost four times as much surely?
Switzerland: 'We're building a high speed rail system.'
UK: 'We had a look at that idea and decided it's too difficult because of all stuff in the way.'
Switzerland: 'Ours will go through mountains.'
UK: 'That sounds too much like work. Anyway you'll never get it deep enough.'
Switzerland: 'It runs 2.3km under a mountain at the lowest point.'
UK: 'It will be unaffordable.'
Switzerland: 'Actually it turned out to be quite cheap.'
UK: 'You'll be over budget.'
Switzerland: 'All projections show we'll be under budget.'
UK: 'This kind of thing always takes forever.'
Switzerland: 'Actually we've just finished. It opens this weekend.'
UK: '...'
Switzerland: 'I guess this explains why you don't have a decent high speed rail system yet.'
![]()
Perhaps you could tell us why Crossrail two is projected to cost £32Bn? Sure, its twice the length of the Gotthard Base, but it's not as deep and costs considerably more than double.
I get the job of working on Londons biggest sewage tunnel ;D
UK: 'All we can guarantee to be one time are endless protests and public enquiries...'
UK: 'All we can guarantee to be one time are endless protests and public enquiries...'
Switzerland: 'We're building a high speed rail system.'
UK: 'We had a look at that idea and decided it's too difficult because of all stuff in the way.'
Switzerland: 'Ours will go through mountains.'
UK: 'That sounds too much like work. Anyway you'll never get it deep enough.'
Switzerland: 'It runs 2.3km under a mountain at the lowest point.'
UK: 'This kind of thing always takes forever.'
Switzerland: 'Actually we've just finished. It opens this weekend.'
[TW]Fox;29568505 said:Exactly - all the stuff in the way versus one mountain. Which effectively means that for tunneling purposes there was nothing in the way. Tunneling through a mountain is different to tunneling under cities etc.
But this isn't because they went 2.3km below the surface so much as because the mountain is 10,000 feet tall!
It took TWENTY YEARS!
Isn't it sad that this is a thread where we all just knock our own country with rubbish hyperbole and no real understanding instead of praising the achievements of others?
Better it be done at some point, rather than never.
By comparison,
Thames tideway is 25km long and estim!ate in total around £4.2 billion, including a 7km Stretch to Lee tunnel and an underground pump station.
(I appreciate they don't need to light /cable this tunnel however!)
(this figure has already doubled tho! Lol)
[TW]Fox;29568505 said:Isn't it sad that this is a thread where we all just knock our own country with rubbish hyperbole and no real understanding instead of praising the achievements of others?