Finally got round to getting this sorted, I’m removing all spindles (about 50 or so) and the bottom rail, I’m leaving the hand rail and the Newell posts and sanding them
Cost is approx £400 for materials and was originally £600 for the Labour although the joiner said he would requote to reflect the reduction in work