Looking good.
Looks like rather than tacking, checking with the 3-4-5 they've gone full on weld, which has pulled everything out of square.
Lucky the customer is OKAY with that.
Have the wheels been added to get around building regs?
It was a head scratching moment for sure. And I did exactly that, 3 foot, 4 foot and 5 foot and it was 45mm out on the 5 foot mark. The weld had deffo pulled it out but the one trailer was perfect, that's the odd thing. Maybe rushing or a different bloke

Yes the wheels are there for regs as it show it's not a permanent structure apparently. I just do what I'm asked to do on this job even though I know half the stuff is iffy

The fly screen on the vent on the exterior wall had fell apart and the duct was full off spiders webs and god know what. The pipe that came from the vent in the bathroom was all buckled up and was left way too long.


I mostly just pulled stuff by hand in the end.
. I really don't need the stress of sorting this at the moment, but I also don't have the money to pay for it to be sorted, so I guess I'll have to. Time to start taking up the laminate in the bedroom above...