Looking to get our bathroom re-done and need to get set my expectations for quotes received.
Work list as follows:
Bathroom Floor and wall tiling
Supply Trim, grouts & adhesives
Prepare bathroom floor surfaces & re ply floor
Removal of bathroom, tiles, radiator etc
First fix plumbing & supply of all pipework, traps & wastes (1 bath, 1 sink, 1 toilet)
Plaster all walls & ceiling
first fix electrics & supply materials
Supply & installation of lights & extractor fan
Installation of all bathroom Equipment
Skip hire
What should I realistically be looking to pay out for this work, not including the cost of tiles or bathroom suite.
The room is 2.4m*2.2m with a sizeable built in cupboard for the boiler (and old water tank - removed at time of boiler replacement), so not a huge room in the slightest.
Work list as follows:
Bathroom Floor and wall tiling
Supply Trim, grouts & adhesives
Prepare bathroom floor surfaces & re ply floor
Removal of bathroom, tiles, radiator etc
First fix plumbing & supply of all pipework, traps & wastes (1 bath, 1 sink, 1 toilet)
Plaster all walls & ceiling
first fix electrics & supply materials
Supply & installation of lights & extractor fan
Installation of all bathroom Equipment
Skip hire
What should I realistically be looking to pay out for this work, not including the cost of tiles or bathroom suite.
The room is 2.4m*2.2m with a sizeable built in cupboard for the boiler (and old water tank - removed at time of boiler replacement), so not a huge room in the slightest.