I know this is a necro thread but I thought I'd chime in anyway.
We've got a 1950s semi with a void of 700mm under the ground floor. Our joists and floor felt quite bouncy but the joists were structurally fine.
I considered all sorts of options but the costs Vs the reward seemed not worth it.
In the end we just went for glue down lvt, with 9mm ply over the floorboards, a layer of screed and then lvt. It was by far the cheapest and most obvious option and it's made a world of difference in both insulation, sound and bounciness.
I'm sure block and beam or solid concrete would be even more solid but it's one of those things where, once it's done, it becomes such a none issue that I'd be annoyed if I'd paid thousands more and a lot more upheaval for not much gain.
We've got a 1950s semi with a void of 700mm under the ground floor. Our joists and floor felt quite bouncy but the joists were structurally fine.
I considered all sorts of options but the costs Vs the reward seemed not worth it.
In the end we just went for glue down lvt, with 9mm ply over the floorboards, a layer of screed and then lvt. It was by far the cheapest and most obvious option and it's made a world of difference in both insulation, sound and bounciness.
I'm sure block and beam or solid concrete would be even more solid but it's one of those things where, once it's done, it becomes such a none issue that I'd be annoyed if I'd paid thousands more and a lot more upheaval for not much gain.